石塑電梯門(mén)套的施工安裝流程是什么?
物料籌備:線(xiàn)條側板泡棉膠硅酮膠(或云石膠)45°切割鋸臺鋸膠槍紅外線(xiàn)儀器;
Material preparation: Line side board foam rubber silicone rubber (or marble rubber) 45 ° cutting saw table saw glue gun infrared instrument;
布局墻體基面清算清潔外面沒(méi)有油污浮塵并查驗墻面平坦度和垂直度。超差部門(mén)應剔鑿或用水泥沙漿修補缺點(diǎn),加固找平,方能施工;
Clean the base surface of the layout wall and ensure there is no oil or dust on the outside. Check the flatness and verticality of the wall surface. Excessive departments should chisel or repair defects with cement mortar, reinforce and level them before construction can proceed;
在墻面找出水平線(xiàn)垂直控制線(xiàn);
Find horizontal and vertical control lines on the wall;
切割鋸采納45度角對線(xiàn)條切割并對角拼接反省平坦度厚板+線(xiàn)條形式:假如墻面是干掛大理石根基,需要用小木方在墻面上找3-4個(gè)點(diǎn),而后用云石膠點(diǎn)粘,小木方周?chē)冒l(fā)泡膠添補;而后將切好45度切角的線(xiàn)條卡扣在側板上,線(xiàn)條另一側點(diǎn)粘到墻面上;薄板+線(xiàn)條形式:
The cutting saw adopts a 45 degree angle to cut the lines and diagonally connect them to reflect on the flatness of the thick plate+line form: if the wall is a dry hanging marble foundation, it is necessary to use small wooden blocks to find 3-4 points on the wall, and then use marble glue to stick them, and use foam glue to fill the surrounding area of the small wooden blocks; Then clip the 45 degree cut line onto the side panel, and stick the other side of the line to the wall at a point; Sheet+Line Form:
假如墻面是干掛大理石根基,需要用細木工板打底,而后將薄板用泡棉膠暫時(shí)牢固,云石膠點(diǎn)粘到細木工板上;而后將薄板切割部門(mén)卡在線(xiàn)條卡槽中 ,將線(xiàn)條裝置到位,壓實(shí),牢固在墻體細木工板基面上??ú垡环矫婺軌蛘趽踝劝迩懈钐幍蔫Υ?,另一方面裝置速率能夠進(jìn)步。(分外闡明:泡棉膠起到暫時(shí)牢固的感化,硅酮膠24小時(shí)內無(wú)奈凝結,但其前期感化力強,以是二者共同應用才能達到預期后果
If the wall is a dry hanging marble foundation, it is necessary to use a blockboard as the base, and then temporarily secure the thin board with foam glue, and stick the marble glue points onto the blockboard; Then clip the thin plate cutting department into the line card slot, install the line in place, compact it, and firmly attach it to the base surface of the wall blockboard. On the one hand, the card slot can cover the defects at the cutting point of the side panel, and on the other hand, the device speed can be improved. (Special clarification: Foam adhesive has a temporary and firm effect, while silicone adhesive cannot coagulate within 24 hours. However, its initial effect is strong, so the combination of the two can achieve the expected results.)
將對角處裂縫打硅酮膠填滿(mǎn)抹
Fill and apply silicone adhesive to the diagonal cracks
將線(xiàn)條與墻的間隙打膠抹
Glue and plaster the gap between the line and the wall
側板依據現實(shí)尺寸用臺鋸切割,施工方法請參照線(xiàn)條(根基平坦,泡棉膠暫時(shí)牢固,硅酮膠點(diǎn)粘
The side panels are cut with a table saw according to the actual size, and the construction method should refer to the line (the foundation is flat, the foam adhesive is temporarily firm, and the silicone adhesive is sticking)
有了聊城鋁合金電梯門(mén)套上面的小總結,希望對廣大客戶(hù)有所幫助,如果有什么不理解的或者尋求幫助的請點(diǎn)擊我們的網(wǎng)站:http://www.wlgzwfw.com或者來(lái)電咨詢(xún),我們會(huì )盡全力為您
With the summary on the Liaocheng aluminum alloy elevator door cover, I hope it can be helpful to our customers. If you have any questions or need help, please click on our website: http://www.wlgzwfw.com Or call for consultation, and we will do our best to solve it for you